Control Centre Operations
TRANSMISSION / OASIS MESSAGES



624 Posted: Mar 11, 2010 11:40 Posted by:

NSPI TransmissionSystemOp

Transmission Normal

67N-T81 is back in service. No restrictions.

________________________________________________________________________________

623 Posted: Mar 10, 2010 17:48 Posted by:

NSPI EnergySystemOperator

120H SVC

120H-SVC is now back in service

________________________________________________________________________________

622 Posted: Mar 09, 2010 08:40 Posted by:

NSPI TransmissionSystemOp

Transmission Outage

120H-SVC SVC Maintenance at 120H terminal. No Restrictions.

________________________________________________________________________________

621 Posted: Mar 08, 2010 19:01 Posted by:

NSPI TransmissionSystemOp

Transmission Normal

L-8001 sky wire repairs completed at 18:55. Restrictions lifted.

________________________________________________________________________________

620 Posted: Mar 08, 2010 10:39 Posted by:

NSPI TransmissionSystemOp

Curtailment

L-8001 Reducing NS Import Limit to 80MW'S. Do to broken sky wire and potential for system seperation.

________________________________________________________________________________

619 Posted: Mar 08, 2010 09:00 Posted by:

NSPI TransmissionSystemOp

Transmission Outage

67N-T81 Replace lightning arrestors on 67N-T81. No Restrictions.

________________________________________________________________________________

616 Posted: Feb 22, 2010 11:28 Posted by:

Alison Gillan

UARB Approves Revised GIP

On February 10, 2010 the NSUARB approved NSPI's filing for a revised Generator Interconnection Procedure (GIP) with an effective date of February 22, 2010. All revised GIP documents and details can be found at: http://oasis.nspower.ca/en/home/oasis/revisedgenerationinterconnectionprocedures.aspx

________________________________________________________________________________

611 Posted: Feb 10, 2010 10:38 Posted by:

Alison Gillan

Employee transfer

Effective March 1, 2010 Francis DeBay will assume the role of System Control Superintendent, Energy and Transmission, within NSPSO. Previously Francis was Team Leader on the Marketing Desk with Fuels, Energy and Risk Management at NSPI.