Outage NumberStatusStart TimeStop TimePurpose
6446APPROVEDJan 23, 2012 08:00 ASFeb 03, 2012 18:00 ASHVEM's and Electricians; replace the Sub #2 125VDC Battery Bank and the two Battery Chargers. A temporary bank and charger will be installed until the new gear is commissioned. No disruption to the 125VDC supply.
6565APPROVEDFeb 01, 2012 10:00 ASFeb 24, 2012 19:00 ASHVDC circuit repair
6540APPROVEDFeb 03, 2012 09:00 ASFeb 03, 2012 16:00 AShold off bus 2 to service switch B2-138D (jumper method)
6456CANCELLEDFeb 03, 2012 09:00 ASFeb 03, 2012 16:00 AShold off Bus 2 to service T3-BD during return switching (assumes not completed on Jan 23)
6569APPROVEDFeb 03, 2012 10:44 ASFeb 15, 2012 00:00 ASShort Notice Forced Outage or Trip
6509APPROVEDFeb 03, 2012 13:00 ASFeb 03, 2012 16:00 AShold off L1133 to service switch 1133-02D with line open at Keswick end
6548APPROVEDFeb 06, 2012 09:00 ASFeb 06, 2012 16:00 AShold off L1125 to service switch 1125-1LD (jumper method)
6549APPROVEDFeb 07, 2012 09:00 ASFeb 07, 2012 16:00 AShold off L1125 to service switch 1125-1BD (jumper method)
6505CANCELLEDFeb 08, 2012 08:00 ASFeb 08, 2012 18:00 ASHVEM's; permit required to repair air leak on breaker K3-5 Control Block, phase #1. Estimated to be a Priority 1.
6550APPROVEDFeb 08, 2012 09:00 ASFeb 08, 2012 16:00 AShold off L1126 to service switch 1126-1BD (jumper method)
6551APPROVEDFeb 08, 2012 09:00 ASFeb 08, 2012 16:00 AShold off L1126/L1111 to service switch B1-138D (clean only, no operation)
6552ASSESSMENTFeb 09, 2012 09:00 ASFeb 09, 2012 16:00 AShold off Bus 2 to service switch B2-138D (jumper method)
6555ASSESSMENTFeb 13, 2012 09:00 ASFeb 17, 2012 16:00 ASreplacement of 48 VDC battery chargers in 230 building (A side), Leo feels that most of the equipment can be transferred to the new charger with minor outages, but the RTU will need to be shut down for a few minutes for the transfer so that no false operations can occur
6485CANCELLEDFeb 14, 2012 09:00 ASFeb 15, 2012 16:00 AShold off L2103 to repair hotspot on str. 213
6514APPROVEDFeb 20, 2012 09:00 ASFeb 21, 2012 16:00 AShold off L2103 to repair hotspot on str. 216 (rescheduled from req. # 6485)
6515APPROVEDFeb 21, 2012 09:00 ASFeb 22, 2012 16:00 AShold off L2102 to repair hotspot on str. 132
6399CANCELLEDFeb 29, 2012 09:00 ASMar 01, 2012 16:00 ASwork permit to service switches U5-D, U5-GB and U5-G (discussed with Mactaquac planning)
6401ASSESSMENTMar 05, 2012 08:00 ASMar 09, 2012 18:00 ASHVEM's; Permit to replace the three Bus 2 PT's. These dates will be discussed with Generation at their Outage Meeting, week of Jan.9/12. Will be a TLM and Relay Permit applied for also.
6416ASSESSMENTMar 05, 2012 09:00 ASMar 09, 2012 16:00 ASwork permit to replace insulators on Bus 2, and assist HVEM with Bus 2 PT replacement. Date of outage to be discussed with Generation week of Jan 9th, 2012
6400CANCELLEDMar 07, 2012 09:00 ASMar 08, 2012 16:00 ASwork permit to service switches U6-D, U6-GB and U6-G (discussed with Mactaquac planning) will be a one day outage, two days requested in case of bad weather/system disturbances
6497ASSESSMENTMar 12, 2012 08:00 ADMar 16, 2012 18:00 ADHVEM's; permit required to repair R2 Reactor oil leaks.
6566ASSESSMENTMar 17, 2012 08:00 ADMar 18, 2012 18:00 ADHVEM's; Permit required to repair conduit into Tx mech. box, and adjust drive chain for switch T1-5223. Date agreed to by Bill Mintern of Irving Refinery.
6567ASSESSMENTMar 18, 2012 08:00 ADMar 18, 2012 18:00 ADHVEM's; permit required to repair conduit on Tx mech. box, adjsut chain drive on switch T2-5223, and TLM to replace the leads between T002 and switch T2-5223. Date agreed to with Bill Mintern of Irving Refinery.
6568ASSESSMENTMar 27, 2012 08:00 ADMar 27, 2012 18:00 ADHVEM's; permit required to repair oil leak on breaker IR1-1. Irving has been advised of the Outage date.
6570ASSESSMENTApr 02, 2012 09:00 ADApr 04, 2012 16:00 ADwork permit to repair switch 6D2 (2 missing corona balls)
6523NOT APPROVEDApr 23, 2012 08:00 ADMay 11, 2012 18:00 ADHVEM's; Permit required to repair oil leaks, and repair tapchanger on Bathurst T5. Also, perform 12 year overhaul on breaker B2103.
6357NOT APPROVEDApr 23, 2012 08:00 ADApr 27, 2012 18:00 ADHVEM's; Permit required to perform the six year overhaul on IN1, doble test lightning arrestors, and 6 year on breaker P3-IN1.
6356NOT APPROVEDMay 15, 2012 08:00 ADMay 17, 2012 18:00 ADTLM; L3001 Outage required for switch maintenance, and removal of old Telecom. L3001 Carrier equipment (Wavetraps and Coupling Cap.'s) from the Line.
6011NOT APPROVEDMay 28, 2012 08:00 ADJun 01, 2012 16:00 ADwork permit to replace insulators on L3017/L3019, TLM wants to service switch 3017-01D during the switching at the start of the job
6012CANCELLEDMay 28, 2012 08:00 ADJun 01, 2012 16:00 ADwork permit to replace insulators on L3017/L3019
6424NOT APPROVEDMay 28, 2012 08:00 ADJun 01, 2012 16:00 ADwork permit to replace insulators on L3017/L3019 (previously requested as #6012, but was set as a forced outage rather than planned outage)
6542NOT APPROVEDJun 04, 2012 08:00 ADJun 08, 2012 18:00 ADHVEM's; Permit required to perform the 12 year overhaul on breaker 1126-1.
6376NOT APPROVEDJun 05, 2012 08:00 ADJun 08, 2012 18:00 ADHVEM's; Permit required to apply syl-gard to L3009 CVT's at Lepreau.
4728NOT APPROVEDJun 11, 2012 08:00 ADJun 15, 2012 18:00 ADHVEM's; perform 15 year overhaul on breaker ETC1.
4715NOT APPROVEDJun 18, 2012 08:00 ADJun 22, 2012 18:00 ADHVEM's; perform 15 year overhaul on breaker K3-4.
4721CANCELLEDJun 18, 2012 08:00 ADJun 21, 2012 18:00 ADHVEM's; replace Bathurst L2131 PT's (3), Capital Job.
6355NOT APPROVEDJun 19, 2012 08:00 ADJun 22, 2012 18:00 ADTLM; L3016 Outage required to perform switch maintenance, marker balls installation, Line structure inspections, CVT replacement.
4606NOT APPROVEDJun 25, 2012 08:00 ADJun 29, 2012 18:00 ADHVEM's; perform six year overhaul on T1 transformer, doble T1 PT, and six year maintenance on breakers SA2145, SA1-5 and SA1-6.
4622NOT APPROVEDJun 25, 2012 09:00 ADJun 29, 2012 16:00 ADwork permit on L2145 (while Salisbury T1 is being overhauled) to replace poles on str. 75 (5 pole dead end), and insulators in 230 kV yard
4729NOT APPROVEDJul 09, 2012 08:00 ADJul 13, 2012 18:00 ADHVEM's; perform 15 year overhaul on breaker E2104-TC3.
4735NOT APPROVEDJul 09, 2012 08:00 ADJul 20, 2012 18:00 ADHVEM's; perform 6 year T1 overhaul, and replace PT grounding cubicle (Capital Job).
4601NOT APPROVEDJul 16, 2012 08:00 ADAug 03, 2012 18:00 ADHVEM's; perform 6 year overhaul on Moncton T1 transformer, T1-138 6 year maintenance, T1-C replacement, and replace PT grounding cubicle (Capital job)
4722NOT APPROVEDJul 23, 2012 08:00 ADJul 26, 2012 18:00 ADHVEM's; replace Bathurst L2103 PT's (3), Capital Job.
6384NOT APPROVEDAug 07, 2012 08:00 ADAug 10, 2012 18:00 ADHVEM's; replace Marysville L1112 PT's (3).
4723NOT APPROVEDAug 13, 2012 08:00 ADAug 31, 2012 18:00 ADHVEM's; perform 6 year overhaul on T1 transformer, replace T1 oil, and replace PT grounding cubicle (Capital Job).
4718NOT APPROVEDAug 13, 2012 08:00 ADAug 16, 2012 18:00 ADHVEM's; replace L1104 PT's (3) and perform six year maintenance on breaker F1104 at Marysville Terminal.
4719NOT APPROVEDAug 13, 2012 08:00 ADAug 17, 2012 18:00 ADHVEM's; perform 12 year overhaul on breaker SA3-1.
4730NOT APPROVEDAug 20, 2012 08:00 ADAug 24, 2012 18:00 ADHVEM's; perform 15 year overhaul on breaker ETC3.
4731NOT APPROVEDAug 27, 2012 08:00 ADAug 31, 2012 18:00 ADHVEM's; perform 15 year overhaul on breaker E2103-TC4.
5865NOT APPROVEDSep 10, 2012 00:01 ADSep 16, 2012 23:00 ADAnnual maintenance
5866NOT APPROVEDSep 17, 2012 00:01 ADSep 21, 2012 19:00 ADAnnual maintenance
4733NOT APPROVEDSep 24, 2012 08:00 ADSep 28, 2012 18:00 ADHVEM's; permit to perform 6 year overhaul on T6.
4688NOT APPROVEDSep 24, 2012 08:00 ADSep 28, 2012 18:00 ADHVEM's; perform 6 year overhaul on T1 transformer.
6561NOT APPROVEDSep 29, 2012 06:00 ADOct 02, 2012 18:00 ADMPRP
4720NOT APPROVEDOct 01, 2012 08:00 ADOct 05, 2012 18:00 ADHVEM's; perform 12 year overhaul on breaker SA3-2.
4732NOT APPROVEDOct 01, 2012 08:00 ADOct 05, 2012 18:00 ADHVEM's; perform 15 year overhaul on breaker ETC4.
6504NOT APPROVEDOct 16, 2012 08:00 ADOct 19, 2012 18:00 ADHVEM's; permit required to replace the three L2131 PT's. TLM switch maintenance.
6562NOT APPROVEDNov 01, 2012 06:00 ADNov 07, 2012 18:00 ASMPRP