Category 1 and Category 2 Outages
| Outage Number | Status | Start Time | Stop Time | Purpose |
| 6446 | APPROVED | Jan 23, 2012 08:00 AS | Feb 03, 2012 18:00 AS | HVEM's and Electricians; replace the Sub #2 125VDC Battery Bank and the two Battery Chargers. A temporary bank and charger will be installed until the new gear is commissioned. No disruption to the 125VDC supply. |
| 6565 | APPROVED | Feb 01, 2012 10:00 AS | Feb 24, 2012 19:00 AS | HVDC circuit repair |
| 6540 | APPROVED | Feb 03, 2012 09:00 AS | Feb 03, 2012 16:00 AS | hold off bus 2 to service switch B2-138D (jumper method) |
| 6456 | CANCELLED | Feb 03, 2012 09:00 AS | Feb 03, 2012 16:00 AS | hold off Bus 2 to service T3-BD during return switching (assumes not completed on Jan 23) |
| 6569 | APPROVED | Feb 03, 2012 10:44 AS | Feb 15, 2012 00:00 AS | Short Notice Forced Outage or Trip |
| 6509 | APPROVED | Feb 03, 2012 13:00 AS | Feb 03, 2012 16:00 AS | hold off L1133 to service switch 1133-02D with line open at Keswick end |
| 6548 | APPROVED | Feb 06, 2012 09:00 AS | Feb 06, 2012 16:00 AS | hold off L1125 to service switch 1125-1LD (jumper method) |
| 6549 | APPROVED | Feb 07, 2012 09:00 AS | Feb 07, 2012 16:00 AS | hold off L1125 to service switch 1125-1BD (jumper method) |
| 6505 | CANCELLED | Feb 08, 2012 08:00 AS | Feb 08, 2012 18:00 AS | HVEM's; permit required to repair air leak on breaker K3-5 Control Block, phase #1. Estimated to be a Priority 1. |
| 6550 | APPROVED | Feb 08, 2012 09:00 AS | Feb 08, 2012 16:00 AS | hold off L1126 to service switch 1126-1BD (jumper method) |
| 6551 | APPROVED | Feb 08, 2012 09:00 AS | Feb 08, 2012 16:00 AS | hold off L1126/L1111 to service switch B1-138D (clean only, no operation) |
| 6552 | ASSESSMENT | Feb 09, 2012 09:00 AS | Feb 09, 2012 16:00 AS | hold off Bus 2 to service switch B2-138D (jumper method) |
| 6555 | ASSESSMENT | Feb 13, 2012 09:00 AS | Feb 17, 2012 16:00 AS | replacement of 48 VDC battery chargers in 230 building (A side), Leo feels that most of the equipment can be transferred to the new charger with minor outages, but the RTU will need to be shut down for a few minutes for the transfer so that no false operations can occur |
| 6485 | CANCELLED | Feb 14, 2012 09:00 AS | Feb 15, 2012 16:00 AS | hold off L2103 to repair hotspot on str. 213 |
| 6514 | APPROVED | Feb 20, 2012 09:00 AS | Feb 21, 2012 16:00 AS | hold off L2103 to repair hotspot on str. 216 (rescheduled from req. # 6485) |
| 6515 | APPROVED | Feb 21, 2012 09:00 AS | Feb 22, 2012 16:00 AS | hold off L2102 to repair hotspot on str. 132 |
| 6399 | CANCELLED | Feb 29, 2012 09:00 AS | Mar 01, 2012 16:00 AS | work permit to service switches U5-D, U5-GB and U5-G (discussed with Mactaquac planning) |
| 6401 | ASSESSMENT | Mar 05, 2012 08:00 AS | Mar 09, 2012 18:00 AS | HVEM's; Permit to replace the three Bus 2 PT's. These dates will be discussed with Generation at their Outage Meeting, week of Jan.9/12. Will be a TLM and Relay Permit applied for also. |
| 6416 | ASSESSMENT | Mar 05, 2012 09:00 AS | Mar 09, 2012 16:00 AS | work permit to replace insulators on Bus 2, and assist HVEM with Bus 2 PT replacement. Date of outage to be discussed with Generation week of Jan 9th, 2012 |
| 6400 | CANCELLED | Mar 07, 2012 09:00 AS | Mar 08, 2012 16:00 AS | work permit to service switches U6-D, U6-GB and U6-G (discussed with Mactaquac planning) will be a one day outage, two days requested in case of bad weather/system disturbances |
| 6497 | ASSESSMENT | Mar 12, 2012 08:00 AD | Mar 16, 2012 18:00 AD | HVEM's; permit required to repair R2 Reactor oil leaks. |
| 6566 | ASSESSMENT | Mar 17, 2012 08:00 AD | Mar 18, 2012 18:00 AD | HVEM's; Permit required to repair conduit into Tx mech. box, and adjust drive chain for switch T1-5223. Date agreed to by Bill Mintern of Irving Refinery. |
| 6567 | ASSESSMENT | Mar 18, 2012 08:00 AD | Mar 18, 2012 18:00 AD | HVEM's; permit required to repair conduit on Tx mech. box, adjsut chain drive on switch T2-5223, and TLM to replace the leads between T002 and switch T2-5223. Date agreed to with Bill Mintern of Irving Refinery. |
| 6568 | ASSESSMENT | Mar 27, 2012 08:00 AD | Mar 27, 2012 18:00 AD | HVEM's; permit required to repair oil leak on breaker IR1-1. Irving has been advised of the Outage date. |
| 6570 | ASSESSMENT | Apr 02, 2012 09:00 AD | Apr 04, 2012 16:00 AD | work permit to repair switch 6D2 (2 missing corona balls) |
| 6523 | NOT APPROVED | Apr 23, 2012 08:00 AD | May 11, 2012 18:00 AD | HVEM's; Permit required to repair oil leaks, and repair tapchanger on Bathurst T5. Also, perform 12 year overhaul on breaker B2103. |
| 6357 | NOT APPROVED | Apr 23, 2012 08:00 AD | Apr 27, 2012 18:00 AD | HVEM's; Permit required to perform the six year overhaul on IN1, doble test lightning arrestors, and 6 year on breaker P3-IN1. |
| 6356 | NOT APPROVED | May 15, 2012 08:00 AD | May 17, 2012 18:00 AD | TLM; L3001 Outage required for switch maintenance, and removal of old Telecom. L3001 Carrier equipment (Wavetraps and Coupling Cap.'s) from the Line. |
| 6011 | NOT APPROVED | May 28, 2012 08:00 AD | Jun 01, 2012 16:00 AD | work permit to replace insulators on L3017/L3019, TLM wants to service switch 3017-01D during the switching at the start of the job |
| 6012 | CANCELLED | May 28, 2012 08:00 AD | Jun 01, 2012 16:00 AD | work permit to replace insulators on L3017/L3019 |
| 6424 | NOT APPROVED | May 28, 2012 08:00 AD | Jun 01, 2012 16:00 AD | work permit to replace insulators on L3017/L3019 (previously requested as #6012, but was set as a forced outage rather than planned outage) |
| 6542 | NOT APPROVED | Jun 04, 2012 08:00 AD | Jun 08, 2012 18:00 AD | HVEM's; Permit required to perform the 12 year overhaul on breaker 1126-1. |
| 6376 | NOT APPROVED | Jun 05, 2012 08:00 AD | Jun 08, 2012 18:00 AD | HVEM's; Permit required to apply syl-gard to L3009 CVT's at Lepreau. |
| 4728 | NOT APPROVED | Jun 11, 2012 08:00 AD | Jun 15, 2012 18:00 AD | HVEM's; perform 15 year overhaul on breaker ETC1. |
| 4715 | NOT APPROVED | Jun 18, 2012 08:00 AD | Jun 22, 2012 18:00 AD | HVEM's; perform 15 year overhaul on breaker K3-4. |
| 4721 | CANCELLED | Jun 18, 2012 08:00 AD | Jun 21, 2012 18:00 AD | HVEM's; replace Bathurst L2131 PT's (3), Capital Job. |
| 6355 | NOT APPROVED | Jun 19, 2012 08:00 AD | Jun 22, 2012 18:00 AD | TLM; L3016 Outage required to perform switch maintenance, marker balls installation, Line structure inspections, CVT replacement. |
| 4606 | NOT APPROVED | Jun 25, 2012 08:00 AD | Jun 29, 2012 18:00 AD | HVEM's; perform six year overhaul on T1 transformer, doble T1 PT, and six year maintenance on breakers SA2145, SA1-5 and SA1-6. |
| 4622 | NOT APPROVED | Jun 25, 2012 09:00 AD | Jun 29, 2012 16:00 AD | work permit on L2145 (while Salisbury T1 is being overhauled) to replace poles on str. 75 (5 pole dead end), and insulators in 230 kV yard |
| 4729 | NOT APPROVED | Jul 09, 2012 08:00 AD | Jul 13, 2012 18:00 AD | HVEM's; perform 15 year overhaul on breaker E2104-TC3. |
| 4735 | NOT APPROVED | Jul 09, 2012 08:00 AD | Jul 20, 2012 18:00 AD | HVEM's; perform 6 year T1 overhaul, and replace PT grounding cubicle (Capital Job). |
| 4601 | NOT APPROVED | Jul 16, 2012 08:00 AD | Aug 03, 2012 18:00 AD | HVEM's; perform 6 year overhaul on Moncton T1 transformer, T1-138 6 year maintenance, T1-C replacement, and replace PT grounding cubicle (Capital job) |
| 4722 | NOT APPROVED | Jul 23, 2012 08:00 AD | Jul 26, 2012 18:00 AD | HVEM's; replace Bathurst L2103 PT's (3), Capital Job. |
| 6384 | NOT APPROVED | Aug 07, 2012 08:00 AD | Aug 10, 2012 18:00 AD | HVEM's; replace Marysville L1112 PT's (3). |
| 4723 | NOT APPROVED | Aug 13, 2012 08:00 AD | Aug 31, 2012 18:00 AD | HVEM's; perform 6 year overhaul on T1 transformer, replace T1 oil, and replace PT grounding cubicle (Capital Job). |
| 4718 | NOT APPROVED | Aug 13, 2012 08:00 AD | Aug 16, 2012 18:00 AD | HVEM's; replace L1104 PT's (3) and perform six year maintenance on breaker F1104 at Marysville Terminal. |
| 4719 | NOT APPROVED | Aug 13, 2012 08:00 AD | Aug 17, 2012 18:00 AD | HVEM's; perform 12 year overhaul on breaker SA3-1. |
| 4730 | NOT APPROVED | Aug 20, 2012 08:00 AD | Aug 24, 2012 18:00 AD | HVEM's; perform 15 year overhaul on breaker ETC3. |
| 4731 | NOT APPROVED | Aug 27, 2012 08:00 AD | Aug 31, 2012 18:00 AD | HVEM's; perform 15 year overhaul on breaker E2103-TC4. |
| 5865 | NOT APPROVED | Sep 10, 2012 00:01 AD | Sep 16, 2012 23:00 AD | Annual maintenance |
| 5866 | NOT APPROVED | Sep 17, 2012 00:01 AD | Sep 21, 2012 19:00 AD | Annual maintenance |
| 4733 | NOT APPROVED | Sep 24, 2012 08:00 AD | Sep 28, 2012 18:00 AD | HVEM's; permit to perform 6 year overhaul on T6. |
| 4688 | NOT APPROVED | Sep 24, 2012 08:00 AD | Sep 28, 2012 18:00 AD | HVEM's; perform 6 year overhaul on T1 transformer. |
| 6561 | NOT APPROVED | Sep 29, 2012 06:00 AD | Oct 02, 2012 18:00 AD | MPRP |
| 4720 | NOT APPROVED | Oct 01, 2012 08:00 AD | Oct 05, 2012 18:00 AD | HVEM's; perform 12 year overhaul on breaker SA3-2. |
| 4732 | NOT APPROVED | Oct 01, 2012 08:00 AD | Oct 05, 2012 18:00 AD | HVEM's; perform 15 year overhaul on breaker ETC4. |
| 6504 | NOT APPROVED | Oct 16, 2012 08:00 AD | Oct 19, 2012 18:00 AD | HVEM's; permit required to replace the three L2131 PT's. TLM switch maintenance. |
| 6562 | NOT APPROVED | Nov 01, 2012 06:00 AD | Nov 07, 2012 18:00 AS | MPRP |
|